2024 Street Rehabilitation Project

The City of St. Charles is pleased to inform you that the street adjacent to your home or property has been included for paving improvements this year. This project page provides many details about this project, but should you have additional questions please don’t hesitate to contact the City.

2024 STREET PROGRAM PROJECT LOCATIONS:

East of Fox River

STREET

FROM

TO

Chandler Avenue*

Division St.

End

Essex Court

Huntington Rd.

End

Forest Ridge Road

Huntington Rd.

Sterling Ct.

Fox Glen Court

Fox Glen Dr.

 End

Fox Glen Drive

Glenbriar Dr.

Army Trail Rd.

Foxhill Court

Forest Ridge Rd.

End

Glen Eagles Court

Fox Glen Dr.

End

Glenbriar Court

Glenbriar Dr.

End

Glenbriar Drive

Fox Glen Dr.

End

Huntington Road

Fox Chase Blvd.

Forest Ridge Rd.

King Alford Court

King James Ave.

End

King Charles Lane

King Edward Ave.

King Henry Ln.

King Edward Avenue

Foxfield Dr.

King Richard Cir.

King George Lane

King Edward Ave.

King Henry Ln.

King Henry Lane

Foxfield Dr.

King James Ave.

King James Avenue

King Edward Ave.

King Alford Ct.

King James Court

King James Ave.

End

King Richard Court

King James Ave.

End

King William Court

King James Ave.

End

Patricia Lane

Division St.

Via Veneto Dr.

Queen Anne Court

King James Ave.

End

Royal Ashdown Court

Turnberry Rd.

End

Royal Fox Court

Royal Fox Dr.

 End

Royal Fox Drive

N. Kirk Rd.

N. Kirk Rd.

Royal Fox Drive

N. Kirk Rd.

End

Royal Kings Court

Turnberry Rd.

End

Royal Lytham Court

Royal Lytham Dr.

End

Royal Lytham Drive

Royal Fox Dr.

End

Royal Queens Court

Turnberry Rd.

End

Royal Troon Court

Royal Fox Dr.

End

Sterling Court

Forest Ridge Rd.

End

Turnberry Road

Royal Fox Dr.

Royal Fox Dr.

Via Veneto Drive*

Division St.

Cumberland Green Dr.

Walnut Hill Avenue

Division St.

S. Tyler Rd.

 

 

 

West of Fox River

STREET

FROM

TO

Abbeywood Drive

N. 2nd St. / IL 31

Greenwood Ln.

Brittany Court

Abbeywood Dr.

End

Crane Road

N. 2nd St. / IL 31

Meadow Dr.

Easton Place

Abbeywood Dr.

End

Edgewild Court

Meadow Dr.

End

Fairhaven Drive

Sunbury Dr.

Valley View Dr.

Fairmont Court

Pleasant Plains Dr.

 End

Grand Ridge Road

Pleasant Plains Dr.

Tower Hill Dr.

Green Willow Lane

Meadow Dr.

End

Hillsboro Court

Tower Hill Dr.

End

Horizon Drive West

Red Sky Dr.

Valley View Dr.

Kensington Place

Meadow Dr.

End

Langston Circle

Heritage St.

Heritage St.

Meadow Dr.

Crane Rd.

City Limits

N. 9th Street

State St.

End

Pendleton Court

Abbeywood Dr.

End

Raphael Court

Red Rose Dr.

End

Red Rose Drive

Renard Ln.

Campton Hills Rd.

Red Sky Drive

Springfield Way

End

Springfield Way

Peck Rd.

Pleasant Plains Dr.

St. Michel Court

Red Rose Dr.

 End

St. Michel Lane

Red Rose Dr.

Renard Ln.

Sunbury Drive

Springfield Way

Fairhaven Dr.

Thornhill Farm Lane

Meadow Dr.

N. 2nd St. / IL 31

Valley View Drive

Pleasant Plains Dr.

Horizon Dr. W.

Valley View Drive

Sunbury Dr.

Pleasant Plains Dr.

*Base Reclamation - See Improvements & Process section below for more information. 

CONTRACTOR AND INSPECTOR:

The contract for this work has been awarded to Plote Construction Inc. of Hoffman Estates, IL. City of St. Charles Engineering staff will be performing the on-site construction inspections and acting as the field liaison to residents and property owners.

START DATES & COMPLETION DATES:

The contractor will not be working on all streets at one time, but will be splitting the work up into smaller sections.  We are working with the contractor to determine the exact start dates, but generally anticipate construction to start in early May.  The roadway work is scheduled to be completed in early October with final restoration to be completed in early November.  

IMPROVEMENTS & PROCESS:

This project has been divided into three phases to facilitate the completion of the project in a timely manner and with as little disruption to residents and properties as possible.

  • Phase I: The first phase involves utility, sidewalk, curb, and driveway repairs. 
  • Phase II: The second phase of construction involves street rehabilitation work, which includes pavement grinding, patching,  fresh oil, new asphalt pavement, driveway repairs, and pavement marking.  Please note that it is anticipated that you will have access to your property at all times during this phase.  Due to the limited space however, access to your property may be delayed at times.  Please allow ample time for relocation of your vehicle and for temporary delays that may occur.  To assure that work is performed in a timely manner, please do not park vehicles on the road during construction hours 7 AM – 4 PM.  The second layer of asphalt will be placed once all resurfacing locations are prepared for final surface placement.  This typically takes place approximately one week after the first layer has been placed.
    • Base Reclamation: Chandler Avenue and Via Veneto Drive will be undergoing base reclamation as part of Phase II of the project. Residents on these streets will receive another letter with additional information prior to the start of that work.
  • Phase IIIThe third phase will involve parkway restoration.  All areas disturbed by construction will be restored. A recommended seed maintenance and watering schedule will be available on the project website.

Due to the scope, complexity, and nature of this project, as well as the unpredictability of weather, some delays and disruptions may occur. We ask for your understanding during these times and the understanding that the scope of this project includes improvement of many streets in many areas throughout the City.  There will be times when no work is occurring on your street.  We would like nothing more than to start and finish the construction of one street at a time; however, for economic reasons, it is not a prudent approach.  

PUBLIC RIGHT-OF-WAY:

Please note that all work will be performed within the City right-of-way.   If you have any type of existing features within the City right-of-way area (i.e. sprinkler system, landscape features, special decorative rocks, brick driveways, electronic “invisible” dog fence, etc.), precautions should be taken by you, the homeowner, to remove or store these items right away to assure that they are not damaged. The City will not repair or replace private appurtenances left within the City right-of-way.

PROPERTY ACCESS & PARKING: 

  • Road Resurfacing – The roadway will remain open to traffic during the course of construction in the resurfacing area.  There are many properties that will require curb repairs adjacent to, or in front of, the driveway apron which may temporarily limit access to your property. If this letter includes a parking pass, your property may be impacted by these repairs. Specific instructions have been included with the pass. You will receive door hanger notification 24-48 hours in advance of the work impacting your access; parking passes should be used during this time. If you have not received a parking pass, your access is not anticipated to be impacted. If anything changes during the course of construction, we will notify you. 
  • Parking - “NO PARKING” signs will be posted in the parkway during the phases of the project when vehicles cannot be parked on the street in the project area.  If you will be out of town during construction, please contact us to determine an appropriate location to leave your vehicle.
  • Property Access Assistance - If you should require assistance with special access or are planning an event such as a wedding or large party, please let us know as soon as possible.  The City will do its best to accommodate these special requests.

MAIL & GARBAGE SERVICE:

Mail and Garbage service will not be interrupted during construction.  Please leave your garbage at the end of your driveway on your normally scheduled pick up day by 6 am as pick may occur earlier than normal to avoid the construction work.

PROJECT WEBSITE:

Updates regarding this project can be found on the City’s website at www.stcharlesil.gov/projects.  Look for the 2024 Street Rehabilitation Project under the Public Improvement Projects section.  The City will be adding project updates weekly, typically on Fridays, upon commencement of construction.

CONTACT INFORMATION:

The City appreciates your continued cooperation and patience during this large-scale project. If you have any questions, please feel free to contact Zlatko Nikolov with the City of St. Charles at 630-377-4405 or via email znikolov@stcharlesil.gov.

Thank you for all of your help and understanding throughout this construction project.  We know you will be better served by these improvements and look forward to serving you in the future.

Update - 4/26/24

This week, the contractor began saw-cutting in the Fox Glen Dr area (Fox Glen Dr, Fox Glen Ct, Glenbriar Dr, Glenbriar Ct, and Glen Eagles Ct) and Forest Ridge/Huntington area (Forest Ridge Rd, Huntington Rd, Essex Ct, Sterling Ct, and Foxhill Ct).

Update - 4/22/24

This week, the contractor is expected to begin mobilizing in town in the Fox Glen Dr area (Fox Glen Dr, Fox Glen Ct, Glenbriar Dr, Glenbriar Ct, and Glen Eagles Ct) and later in the week in the Forest Ridge/Huntington area (Forest Ridge Rd, Huntington Rd, Essex Ct, Sterling Ct, and Foxhill Ct). Initial construction activities will include posting of “Road Construction Ahead” (RCA) signs and concrete saw-cutting for spot repairs.

Update - 4/12/24

A preconstruction meeting was held with the contractor this week. A project schedule with street-specific phasing is still being finalized. Resident notification letters will be mailed out with more information regarding the project on 4/19. Next week, the contractor is expected to provide a project schedule for the phasing of work throughout town.